Street Name: |
Rich Road, Twombly Road, John Huber Parkway Road |
Road District: |
DeKalb |
Location: |
Rich Road – Lucas Road to Nelson Road Twombly Road – Lucas Road to 75 East of Nelson Road John Huber Parkway – DeKalb City Limits to 650 feet north of Twombly Road |
Anticipated Start Date: |
May 1, 2018 |
Anticipated Completion Date: |
This project is completed |
Contractor: |
Corrective Asphalt Materials |
Contract Value: |
$39,377.52 |
Completed Contract Price: |
$38,297.28 |
Improvements: |
Rejuvenator – Reclamite, to be applied at a rate of 0.05 to 0.10 gallons per square yard when mixed with water. After penetration in surface, a
coating of dry sand to be applied on surface in sufficient amount to
protect the traveling public as determined by the Resident Engineer |
Traffic: |
Road to remain open to one way traffic during application |