2018 Construction Projects

Rejuvenator Projects

 

Street Name:

South Sixth Street Alley ½ block South of Illinois Route 72

  Municipality:

Village of Kirkland

   Location: South Sixth Street – South Street to Hortense Drive
Alley – South Sixth Street to South Fifth Street
   Anticipated Start Date: May 1, 2018
   Anticipated Completion Date: This project is completed
   Contractor: Corrective Asphalt Materials
   Contract Value: $3,327.24
   Completed Contract Price: $3,740.52

   Improvements:

Rejuvenator – Reclamite, to be applied at a rate of 0.05 to 0.10 gallons per square yard when mixed with water. After penetration in surface, a coating of dry sand to be applied on surface in sufficient amount to protect the traveling public as determined by the Resident Engineer
   Traffic: Road to remain open to one way traffic during application