Street Name: |
South Sixth Street Alley ½ block South of Illinois Route 72 |
Municipality: |
Village of Kirkland |
Location: |
South Sixth Street – South Street to Hortense Drive
Alley – South Sixth Street to South Fifth Street |
Anticipated Start Date: |
May 1, 2018 |
Anticipated Completion Date: |
This project is completed |
Contractor: |
Corrective Asphalt Materials |
Contract Value: |
$3,327.24 |
Completed Contract Price: |
$3,740.52 |
Improvements: |
Rejuvenator – Reclamite, to be applied at a rate of 0.05 to 0.10 gallons per square yard when mixed with water. After penetration in surface, a
coating of dry sand to be applied on surface in sufficient amount to protect the traveling public as determined by the Resident Engineer |
Traffic: |
Road to remain open to one way traffic during application |